ENERGY METERS > TEMPORARY ELECTRIC METERS
Temporary Electric Meters Service
Whether you’re managing a construction project, organising an event, or developing a new site, having a reliable temporary power supply is essential to keep operations running smoothly.
At Flame Energy, we arrange fast and compliant temporary electric supply solutions for businesses across the UK, ensuring your site has safe and dependable power from day one.
Temporary Builders Supply for Construction Projects
A temporary builders supply is commonly required during the early stages of construction before a permanent electricity connection is installed.
This type of supply enables contractors and site teams to power essential equipment such as:
- Tools and machinery
- Site offices and welfare units
- Lighting and security systems
- Temporary heating and drying equipment
We coordinate the full process, from application through to installation, ensuring your site is powered quickly and efficiently.rrange for the installation to be decommissioned or even converted back to a permanent meter.
Temporary Site Power Solutions
Our temporary site power services support a wide range of industries, including construction, infrastructure, events, and redevelopment projects.
We provide tailored solutions based on your site requirements, including:
- Single-phase and three-phase temporary supplies
- Meter installation and setup
- Load assessment and capacity planning
- Safe disconnection once the permanent supply is ready or construction is completed
Every site is different, so we design solutions that ensure safe, reliable and compliant power delivery throughout your project lifecycle.
Temporary Electric Supply Setup
Arranging a temporary electric supply involves several technical and regulatory steps, which we manage on your behalf.
Typical process includes:
Site Assessment
We evaluate your power requirements, project duration, and site conditions.
Application & Planning
We liaise with the relevant Distribution Network Operator (DNO) to secure approval and connection arrangements.
Installation
An accredited engineer installs the temporary meter and supply equipment on-site.
Activation
Your site is energised and ready for use, ensuring minimal disruption to your project timeline.
When Do You Need Temporary Power?
A temporary supply is typically required for:
- Construction and development sites
- New housing or commercial builds
- Infrastructure projects
- Emergency or backup power requirements
- Sites awaiting permanent grid connection
Having the right setup in place ensures safety, compliance, and uninterrupted project delivery.
Benefits of Professional Temporary Power Management
Using a managed service for your temporary supply ensures:
- Faster connection times
- Fully compliant installations
- Reduced project delays
- Safe and certified equipment
- Accurate metering and billing
- Smooth transition to permanent supply
Improper setup can lead to delays, safety risks, and unnecessary costs, which is why professional coordination is essential.
Why Choose Flame Energy?
We provide a complete end-to-end service for temporary power requirements, working with trusted UK contractors and network operators.
Our service includes:
- Temporary meter installation
- Load and capacity assessment
- Safety and compliance management
- Transition to permanent supply
We ensure your temporary builders supply or site connection is delivered quickly, safely, and with minimal disruption.
Get in touch
If you need a temporary power supply, temporary site power, or a temporary electric supply for your project, we can help.
Contact Flame Energy today to arrange a fast, reliable temporary connection tailored to your site requirements.
TEMPORARY METERS
Frequently Asked Questions
It doesn’t take long, typically the same time as it takes to install a new meter.
A temporary builders electric supply can be used as long as the meter is needed for but at some point it will be disconnected or become part of the new supply.
Yes, the rates will be exactly the same as normal market rates.
We operate energy partnership schemes along with full training packages to sell energy.
This is dependent on the size of supply required. The bigger the demand, the bigger meter.
The service will be laid for the amount of supply you need. You can use as many kwh as you need.
This is mainly used for building/development/construction sites for them to do their work and move on.
No. This has to be done by supplier/meter operator. These are legal requirements.
You will need the wiring/infrastructure in place for the temporary energy to be used. If there is nothing in place at the site at the moment then a new service will need to be laid in order for a temp meter to go in.