fb_pixel

COMMERCIAL EV CHARGER INSTALLATION

Charging your business

SUSTAINABILITY > EV CHARGING STATIONS

EV Charging Station for your Business

Flame Energy offer Electric Vehicle (EV) charging points for commercial customers in all locations. Whether you need EV charging for customers or staff in the workplace. We can carry out commercial site surveys to ensure you’re getting the perfect EV charging solution for your site.

With the UK banning the sale of diesel and petrol cars by 2030 and other EU countries by 2035, it’s more important than ever to look to electric vehicles. This ban will cause a huge increase in the demand for electric vehicles so it’s important to offer customers and employees a place to charge their car.

Why choose an EV charging point?

Choosing to fit an EV charging point is a great way to help your business reduce its carbon emissions by reducing your scope one emissions. By switching to an electric car from a diesel car, you can save nearly 200 grams of CO2 per mile. This, in turn, will help to reduce global warming and help your business achieve sustainability targets.

There’s also the added benefit of the Workplace Charging Scheme (WCS). This is a voucher-based scheme for businesses to help cover some of the cost of fitting an electric charging point at your site. This can cover up to 75% of the cost with a maximum of £350 for each socket, with up to 40 sockets. However, this scheme is subject to changes so our experts can keep you up to date with the latest updates.

Why choose our service?

If you’ve chosen to install an EV charging point at your business, you’ll want to ensure that you’re working with suppliers that you can trust. At Flame Energy, we work with industry professionals to give you the peace of mind that your EV chargers will be the right option for your site. Our team of experts will help you throughout the process, ensuring that your EV chargers, whether they’re pedestal or wall units, will provide you with a cost effective, personalised, and sustainable solution to the increased demand for electricity.

Get in touch

Contact us today to find out more about renewable energy for your business.

Powering Success. Power your projects with our water and energy management services.


Reach out today & discover how we can help.

Case Studies
News
Contact

ENERGY & WATER

Frequently Asked Questions

Do EV charge points fit all electric cars?

Yes, charge points that we provide We install products that are supplied with the industry standard type 2 sockets which are fully compatible with all new electric and plug-in-hybrid cars and lcv’s currently available in the UK.

What is the Workplace Charging Scheme?

The Government offers a maximum of £10,000 (£500 per socket) for companies that want to install charging points for their employees. This needs to be applied for before the installation of an EV charging point and is a voucher-based scheme. There is a maximum cap on the claim of 20 sockets per company along with various other eligibility criteria which we can advise you on.

How do you know what kind of electric vehicle (EV) charging point I need?

A full design service is offered for commercial charge points for the workplace, for your customers and car parks or on-street. The availability supply, user charging needs and the physical environment along with other factors are all considered to offer you the most suitable charge points.

What is the average cost of installing an EV Charger?

A 7kW charger can cost between £450 and £800

How many hours does it take to charge an electric car?

On a 7 kW charger, it will take around 8 hours to charge your vehicle. 

Can anyone install EV charging point?

No, EV chargers should only be installed by qualified electricians with experience in installing chargers. 

Do EV charging stations need planning permission?

No, you do not require planning permission.  Businesses can install a charging point in their car parks, including rapid charging points, without planning permission.

Can you charge an EV in the rain?

Yes the charges are built to withstand weather conditions, so you can charge your vehicle in all conditions

How do I claim WCS grant?

What are the three levels of charging stations?

  • Level 1: Standard Standalone Plug. 1.4-1.9 kWh
  • Level 2: Upgraded Outlet for EVs and Large Appliances. 2.5-19.2 kWh
  • Level 3+: DC Fast Charging. Less than 90 kWh but usually 50 kWh
GET IN TOUCH

We're always here for you

Please do not hesitate to contact us if you require further information about how we could improve your Energy management.

Contact Us Energy
Enter the Captcha

© Copyright 2023 FlameUK

All rights reserved.

Sustainability
Energy Management
Energy Meters
Water Management
Sectors
Waste Management
Why Flame Energy?
Complaints
News
Contact

Case Studies

Privacy Policy
Terms & Conditions

Newsletter Signup

Newsletter Signup Energy
Enter the Captcha

Privacy Policy Terms & Conditions

Company Registration Number: 12025193. VAT Number: 357 406 000. Registered address: White House, Wollaton Street, Nottingham, NG1 5GF

Website Design by The New Fat