Whether you’re managing a construction project, organising an event, or developing a new site, having a reliable temporary power supply is essential to keep operations running smoothly.
At Flame Energy, we arrange fast and compliant temporary electric supply solutions for businesses across the UK, ensuring your site has safe and dependable power from day one.
A temporary builders supply is commonly required during the early stages of construction before a permanent electricity connection is installed.
This type of supply enables contractors and site teams to power essential equipment such as:
We coordinate the full process, from application through to installation, ensuring your site is powered quickly and efficiently.rrange for the installation to be decommissioned or even converted back to a permanent meter.
Our temporary site power services support a wide range of industries, including construction, infrastructure, events, and redevelopment projects.
We provide tailored solutions based on your site requirements, including:
Every site is different, so we design solutions that ensure safe, reliable and compliant power delivery throughout your project lifecycle.
Arranging a temporary electric supply involves several technical and regulatory steps, which we manage on your behalf.
Typical process includes:
Site Assessment
We evaluate your power requirements, project duration, and site conditions.
Application & Planning
We liaise with the relevant Distribution Network Operator (DNO) to secure approval and connection arrangements.
Installation
An accredited engineer installs the temporary meter and supply equipment on-site.
Activation
Your site is energised and ready for use, ensuring minimal disruption to your project timeline.
A temporary supply is typically required for:
Having the right setup in place ensures safety, compliance, and uninterrupted project delivery.
Using a managed service for your temporary supply ensures:
Improper setup can lead to delays, safety risks, and unnecessary costs, which is why professional coordination is essential.
We provide a complete end-to-end service for temporary power requirements, working with trusted UK contractors and network operators.
Our service includes:
We ensure your temporary builders supply or site connection is delivered quickly, safely, and with minimal disruption.
If you need a temporary power supply, temporary site power, or a temporary electric supply for your project, we can help.
Contact Flame Energy today to arrange a fast, reliable temporary connection tailored to your site requirements.
Whether you’re approaching contract renewal, looking to reduce costs or planning your sustainability strategy, our specialists are here to help you find the right solution for your business.
Find clear answers to some of the most common questions we’re asked about our services and how we support your business.
A temporary electricity supply is a short-term power connection used to provide electricity for projects or locations where a permanent connection is not yet available. It is commonly used for construction sites, temporary buildings, events or during site upgrades until a permanent supply is installed.
Yes. Temporary electricity supplies are commonly used for construction sites to provide power for tools, lighting, welfare facilities and other site equipment before a permanent connection is available. The size and type of supply needed depends on the project's energy requirements and expected duration.
The cost of a temporary electricity supply depends on factors such as the power required, length of use, site conditions, equipment needed and connection requirements. A quote is needed to confirm the cost based on your specific project.
The time to install a temporary electricity supply depends on the site requirements, availability of equipment, approvals and the level of power needed. Simple temporary supplies can often be arranged quickly, while larger or more complex requirements may take longer to plan and install.
Yes. Flame Energy can help businesses explore temporary electricity supply requirements and support the process of arranging a suitable solution. The exact approach depends on the site, required power capacity, project timescales and connection requirements.